{"id":1034,"date":"2026-04-01T15:16:59","date_gmt":"2026-04-01T15:16:59","guid":{"rendered":"https:\/\/junta2.com\/stopplansolarvinalopo\/?p=1034"},"modified":"2026-04-13T16:02:51","modified_gmt":"2026-04-13T16:02:51","slug":"psf-idella","status":"publish","type":"post","link":"https:\/\/junta2.com\/stopplansolarvinalopo\/psf-idella\/","title":{"rendered":"PSF Idella"},"content":{"rendered":"\n<p>Ubicaci\u00f3n:<strong> Elda (Alicante)<\/strong><br>Promotor: <strong>Mirlo Blanco Renovables, S.L.<\/strong><br>Estado: <strong>En tramitaci\u00f3n<\/strong><br>Potencia instalada: <strong>El proyecto contempla una potencia pico de\u00a024,98 MWp<\/strong><br>Producci\u00f3n: No disponible<br>N\u00famero de paneles: <strong>Aproximadamente\u00a049.952 paneles\u00a0fotovoltaicos de 500 Wp cada uno.<\/strong><br>Superficie: <strong>La ocupaci\u00f3n directa por paneles es de unas\u00a011,60 hect\u00e1reas, aunque el \u00e1rea total de la poligonal del proyecto es mayor, superando las\u00a044 hect\u00e1reas\u00a0en algunos informes de planeamiento.<\/strong><br>L\u00ednea de evacuaci\u00f3n:<strong> Incluye una\u00a0l\u00ednea a\u00e9rea de 66 kV\u00a0que conectar\u00e1 la planta con la infraestructura el\u00e9ctrica regional.<\/strong><br><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"876\" height=\"607\" src=\"https:\/\/junta2.com\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-09-160035.png\" alt=\"\" class=\"wp-image-1068\" srcset=\"https:\/\/junta2.com\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-09-160035.png 876w, https:\/\/junta2.com\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-09-160035-300x208.png 300w, https:\/\/junta2.com\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-09-160035-768x532.png 768w\" sizes=\"(max-width: 876px) 100vw, 876px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Ubicaci\u00f3n: Elda (Alicante)Promotor: Mirlo Blanco Renovables, S.L.Estado: En tramitaci\u00f3nPotencia instalada: El proyecto contempla una potencia pico de\u00a024,98 MWpProducci\u00f3n: No disponibleN\u00famero de paneles:<\/p>\n<p class=\"link-more\"><a class=\"myButt \" href=\"https:\/\/junta2.com\/stopplansolarvinalopo\/psf-idella\/\">Leer m\u00e1s<\/a><\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[],"class_list":["post-1034","post","type-post","status-publish","format-standard","hentry","category-proyectos"],"_links":{"self":[{"href":"https:\/\/junta2.com\/stopplansolarvinalopo\/wp-json\/wp\/v2\/posts\/1034","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/junta2.com\/stopplansolarvinalopo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/junta2.com\/stopplansolarvinalopo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/junta2.com\/stopplansolarvinalopo\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/junta2.com\/stopplansolarvinalopo\/wp-json\/wp\/v2\/comments?post=1034"}],"version-history":[{"count":2,"href":"https:\/\/junta2.com\/stopplansolarvinalopo\/wp-json\/wp\/v2\/posts\/1034\/revisions"}],"predecessor-version":[{"id":1069,"href":"https:\/\/junta2.com\/stopplansolarvinalopo\/wp-json\/wp\/v2\/posts\/1034\/revisions\/1069"}],"wp:attachment":[{"href":"https:\/\/junta2.com\/stopplansolarvinalopo\/wp-json\/wp\/v2\/media?parent=1034"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/junta2.com\/stopplansolarvinalopo\/wp-json\/wp\/v2\/categories?post=1034"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/junta2.com\/stopplansolarvinalopo\/wp-json\/wp\/v2\/tags?post=1034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}